"Value engineering" was never supposed to mean stripping out everything you planned. It was meant to bring MORE value through engineering — not just slash line items because the budget's blown.
Prefab and offsite methods flip the script: you stop having to choose between quality and cost. You engineer the waste out of the delivery model itself — not out of the project.
🎙️ https://www.activatingcuriosity.com/construction-delays-design/
What's one thing you've seen cut from a project in the name of "value engineering" that should have stayed? 👇