Construction and AEC leaders — this is what 70-hour weeks cost the humans who build your projects.

"Drugs to stay awake. Drugs to kill the pain." Josh Mensinger doesn't soften it. He's watched it happen. And then he asks the question every leader should be asking: what if prefab could make 40 hours pay the same as 70 — and let people go home without being half dead?

Key drivers:
The physical toll the industry has accepted as normal
Why the next generation is walking away from construction
How industrialized construction changes the math on quality of life
The shift: Prefab isn't about efficiency metrics. It's about whether this industry has a workforce in 20 years. The people building your projects are breaking — and there's a better way.

🎧 Full episode: Activating Curiosity with Ryan Ware — "The Hardest Truth About Prefab No One in Construction Wants to Admit"

Subscribe for more construction leadership insights every week.

www.ActivatingCuriosity.com
www.ConnectiveConsultingGrp.com