Construction and AEC leaders — the mistake every prefab project makes isn't in the factory. It happens months earlier, in design.
The team rushes to fabrication before the plans are truly ready. Then the change orders pile up. Josh Mensinger (20+ years in offsite construction) explains why front-loading design is the difference between prefab that saves money and prefab that burns it.

Key drivers:
Why rushing into fabrication guarantees rework
The critical path blind spot most project teams miss
How slowing down design accelerates everything downstream
The shift: Prefab isn't a manufacturing solution. It's a design discipline. Leaders who treat it as one win — and everyone else pays for the change orders.

🎧 Full episode: Activating Curiosity with Ryan Ware — "The Hardest Truth About Prefab No One in Construction Wants to Admit"

Subscribe for more construction leadership insights every week.

ActivatingCuriosity.com
ConnectiveConsultingGrp.com