Construction and AEC leaders may be using the wrong definition of standards in prefab and modular construction.
What if the standard is not the size, color, or shape of the building—but the team behind it?
Melanie Taylor of BILT explains why industrialized construction requires leaders to rethink what “standard” actually means.
Key drivers:
Prefab does not have to look one specific way
Modular construction should not be limited by old assumptions
The team may matter more than the physical format
Better collaboration can redefine the standard
The future of construction may depend less on making every building look the same and more on building stronger teams around better processes.
Watch the full Melanie Taylor episode through ActivatingCuriosity.com.
Subscribe for more conversations about construction leadership and change.


